Culvert Replacement by Nicol of Skene
60%
fewer deliveries to site
25%
reduced excavation
96%
reduction in material weight
Replacement of 2100mmØ Corrugated Steel Culvert with Aquaspira CSR Pipes.
To read the full case study by Nicol Skene – https://www.nicolofskene.com/work/culvert-replacement
Challenge
Sourcing a suitably strong, corrosion resistant pipe, without resorting to cumbersome and carbon intensive concrete pipes. Forming very large concrete bends and chambers at depth would be undesirable and inefficient.

Solution
Aquaspira CSR pipe, with smooth HDPE internal bore provided a 120+ Year Design Life. The lighter weight pipes and prefabricated access units and bends offered a much safer and more efficient method of construction.
Outcome
The project was safely completed well within the planned timescale, providing the client with a cost-effective long-term solution.

Aquaspira pipes and prefabricated units played a pivotal role in the successful execution of the project.
Michael Miskelly
Operations Director | Nicol of Skene