Skip to main content

Countryside Homes, Liverpool – John Reilly Civil Engineering

fewer deliveries through previous occupied phases

reduced excavation

improved productivity

Installing 1050mmØ and 900mmØ Aquaspira CSR Pipes.

Challenge

Reducing numbers of deliveries into an existing development and minimising the programme time for installing the roads and sewers.

Solution

Selection of Aquaspira pipes reduced the number of site deliveries by 60%, reduced excavation by 25%, and with no requirement for stub & rocker pipes, connections into manholes were simplified too.

Outcome

Disruption to existing residents was greatly reduced and the roads and sewers were completed weeks ahead of schedule

Related customer stories

Carbon and Efficiency Targets Exceeded for DCWW CSO at Llanwern

74m 55% 4 week Carbon Reduction and Efficiency Targets Exceeded for Dwr Cymru Welsh Water…

Low carbon solution for Helsington Moss Highway Culvert

An alternative solution was devised to incorporate Aquaspira pipes and a vegetated bag system. This…

Culvert Replacement by Nicol of Skene

Sourcing a suitably strong, corrosion resistant pipe, without resorting to cumbersome and carbon intensive concrete…